Reynoldston WWTW

Client: Dwr Cymru Welsh Water
Scheme: Reynoldston WWTW, Gower

YBCE were awarded a contract to construct a new Waste Water Treatment Works at Reynoldston WWTW, Gower.

The scheme required the construction of in-situ concrete chambers, plinths, pumping stations, gravity mains, rising mains, ducts, draw pits and the construction of a new access road.

The in-situ concrete structures include a RBC tank 26 metres long by 7 metres wide by 6 metres deep.  Also 2 no. Final Settlement Tanks 14 metres diameter.

The contract duration was 56 weeks including commissioning of the new water treatment works.  The works has recently been commissioned and the remaining old WWTW can now be demolished.

This scheme highlights YBCE’s experience in delivering a wide variety of civil engineering activities including shallow and deep drainage.  Also the construction of pumping stations and manhole chambers.

Other Projects

Strata Florida Hydro Scheme

Capel Dewi River Crossing

Folly Farm Underpass

Llanina Waste Water Treatment Works

Visit the Young Bros Facebook Page
Young Bros Limited, “The Ashes”, Llandissilio, Clunderwen, Pembrokeshire, SA66 7TT Tel: 01437 563259 Fax: 01437 563835 E-mail: andrew@ybce.co.uk
Visit the Young Bros Google Plus Profile
Young Bros Limited
“The Ashes”, Llandissilio, Clunderwen, Pembrokeshire, SA66 7TT
Tel: 01437 563259 Fax: 01437 563835 E-mail: andrew@ybce.co.uk
Site designed by Modern Print & Design